hm-atif-wafik

Traffic Movement Becomes Normal On Dhaka-Tangail-Bangabandhu Bridge Highway

Photo: Collected

Photo: Collected

On the Dhaka-Tangail-Bangabandhu Bridge highway traffic movement has returned to normal after disruption of about ten hours. Vehicles started running after 11am on Saturday (June 15). Earlier, a 14-km long traffic jam brought the Dhaka-Tangail-Bangabandhu Bridge highway to a standstill, stretching from the east side of Bangabandhu Bridge to Elenga in Kalihati upazila of Tangail.

This situation was created due to the increased number of North Bengal-bound vehicles on the highway and suspension of toll collection on the bridge more than once at night ahead of Eid-ul-Azha, one of the largest religious festivals for Muslims.

The traffic congestion began early Saturday (June 15), causing inconvenience to home-bound travellers and vehicle drivers during the Eid season.

Officer-in-Charge (OC) of Bangabandhu Bridge East Police Station Alamgir said, “Vehicles started running on the highway. At present, vehicles of different modes are operating at normal speed.”

Subscribe Shampratik Deshkal Youtube Channel

Comments

Shampratik Deshkal Epaper

Logo

Address: 10/22 Iqbal Road, Block A, Mohammadpur, Dhaka-1207

© 2024 Shampratik Deshkal All Rights Reserved. Design & Developed By Root Soft Bangladesh